Integration Testing: Sequential Merge and Validation of Four Feature Branches (PR #43,#44, #45,#46)
Compare changes
- Krish Moodbidri authored
- Detach the prod_queue_volume from the production instance - Create a snapshot of the prod_queue_volume - Reattach the prod_queue_volume to the production instance
+ 7
− 1
@@ -42,13 +42,19 @@ prep-deploy: